Outdoor Surfaces Built to Last Decades

Patio Coatings in Saint George and Provo, UT, for Concrete Stained by Grills, Furniture, and Years of Sun Exposure

Backyard patio slabs in Saint George and Ivins were poured decades ago when construction methods prioritized speed over surface finish, which leaves the concrete porous enough to absorb grease from grills, rust from furniture legs, and tannins from leaves. Rhino Concrete Coatings applies outdoor coating systems to those slabs after diamond grinding removes the stain layer and opens the concrete pores, so the coating bonds directly to the substrate rather than sitting on top of contamination. You end up with a slip-resistant surface that cleans with a hose and holds its color through summers that hit triple digits for weeks at a time.


The work begins with diamond grinding, which strips stains that have soaked into the pores and creates the rough texture the coating needs to bond mechanically. Cracks are filled during prep, then a base coat goes down followed by a topcoat in either a solid color or a flake pattern, depending on what you choose at the estimate. The flake finish hides minor surface variations and gives you texture underfoot, while the solid finish shows the concrete grain and works well when you want a uniform appearance across a large slab.


Schedule a property evaluation to identify staining depth and discuss color options for your outdoor space.

What Proper Surface Preparation Requires

Diamond grinding replaces the degreasing step that other contractors use, because it physically removes the contaminated concrete rather than trying to dissolve it with chemicals that leave residue. The grinder exposes fresh aggregate and opens the pores across the entire slab, which gives the base coat a mechanical anchor rather than relying on adhesion alone. Once the base coat cures, the topcoat adds UV stability and slip resistance, and you can walk on the surface within 24 hours in most cases.


After the coating cures, you will notice that water beads instead of soaking in, grease wipes off without leaving a shadow, and furniture can be dragged across the surface without scratching through to bare concrete. The coating comes with a 10-year warranty on epoxy systems or a 20-year warranty when polyaspartic is used as the topcoat, and the slip resistance stays consistent because the texture is built into the topcoat rather than added as a separate broadcast.


The system includes preparation, crack repair, base coat, topcoat and cleanup, but it does not include structural repairs to the slab itself or removal of heavy coatings applied by previous contractors. If the slab has settled or large sections have separated, those issues need to be addressed before coating starts, since the coating follows the contour of the concrete and will not level a slab that has moved.

Common Questions About This Service

Property owners in Saint George often ask how the coating holds up to direct sun and whether the color will fade after several seasons of exposure.

  • What happens during the diamond grinding step?

    The grinder removes the top layer of concrete along with any stain that has soaked into the pores, and it leaves a rough surface that the base coat can grip mechanically, which is stronger than relying on chemical adhesion alone.

  • How does the flake finish differ from the solid color option?

    The flake finish uses colored chips broadcast into the base coat before the topcoat goes down, which hides minor surface imperfections and gives you more texture underfoot, while the solid finish shows the concrete grain and works well when you want a uniform appearance across the entire patio.

  • Why does staining on older Saint George patios require grinding rather than a surface wipe?

    Backyard slabs in homes built during the growth periods of the 1980s and 1990s were poured with minimal finish work, which left the concrete porous enough to absorb grease and rust several millimeters deep, so a surface cleaner will not reach the contamination that has soaked into the pores.

  • What should you do to prepare the patio before the crew arrives?

    Move all furniture, grills and planters off the slab, and clear a path from the driveway to the work area so the grinder and coating materials can be brought in without dragging hoses across landscaping.

  • How long does the coating take to cure before you can use the patio again?

    Most systems are ready for foot traffic within 24 hours and can handle furniture and grills after 48 hours, though full cure takes several days depending on temperature and which topcoat was used.

Rhino Concrete Coatings also applies patio coatings in Mesquite, Hurricane, Washington, Ivins, and Santa Clara. Rhino Concrete Coatings provides free estimates on every project, and the crew will walk the slab with you to discuss color options and explain which stains will require additional grinding before the coating can be applied.